page_banner

Short Lead Time for Wastewater Treatment Plant Plan - Town of Plymouth, USA – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

As for aggressive costs, we believe that you will be searching far and wide for anything that can beat us. We can state with absolute certainty that for such high-quality at such rates we have been the lowest around for Mbr Wastewater Treatment Construction, Centralized Mbr Sewage Treatment, Advanced Biological Wastewater Treatment Design Project, In addition, we would properly tutorial the purchasers about the application techniques to adopt our items plus the way to select appropriate materials.
Short Lead Time for Wastewater Treatment Plant Plan - Town of Plymouth, USA – JDL Detail:

Location: Town of Plymouth, USA

Time: 2019

Treatment Capacity: 19m3/d

WWTP Type: Integrated FMBR Equipment WWTP

Process: Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In March 2018, in order to discover the leading edge new technologies in the field of wastewater treatment and achieve the goal of reducing the energy consumption of wastewater treatment, Massachusetts, as a global clean energy center, publicly solicited cutting-edge technologies for wastewater treatment globally, which was hosted by Massachusetts clean energy center (MASSCEC), and carried out innovative technology pilot in the public or authorized wastewater treatment area of Massachusetts.

The MA State Environmental Protection Agency organized authoritative experts to conduct a one-year rigorous assessment of the energy consumption benchmarks, estimated consumption reduction targets, engineering plans, and standard requirements of the collected technical solutions. In March 2019, the Massachusetts government announced that Jiangxi JDL Environmental Protection Co., Ltd.’s “FMBR Technology” was selected and granted the highest funding ($ 150,000), and a pilot will be conducted at the Plymouth Airport Wastewater Treatment Plant in Massachusetts.

The effluent treated by FMBR equipment is generally stable since the operation of the project, and the average value of each index is better than the local discharge standard (BOD≤30mg/L, TN≤10mg/L).

The average removal rate of each index is as follows:

COD: 97%

Ammonia nitrogen: 98.7%

Total nitrogen: 93%

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

Short Lead Time for Wastewater Treatment Plant Plan - Town of Plymouth, USA – JDL detail pictures


Related Product Guide:

While in the past few years, our organization absorbed and digested innovative technologies both equally at home and abroad. Meanwhile, our organization staffs a group of experts devoted for the advancement of Short Lead Time for Wastewater Treatment Plant Plan - Town of Plymouth, USA – JDL , The product will supply to all over the world, such as: Suriname, Dominica, Kuala Lumpur, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we will earnestly provide qualified products and good service for domestic and international customers.
  • The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Salome from Manchester - 2018.12.14 15:26
    Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Frederica from venezuela - 2018.06.09 12:42
    Write your message here and send it to us