Short Lead Time for Wastewater Treatment Plant Plan - Bajing Town, China – JDL Detail:
Location: Bajing Town, China
Time: 2014
Treatment Capacity: 2,000 m3/d
WWTP Type: Integrated FMBR Equipment WWTPs
Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent
Project Brief:
By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended. In order to achieve efficient wastewater treatment, the local government finally selected the JDL FMBR technology after study. The treatment capacity of the project is 2,000m3/d, the footprint of FMBR equipment is only 200m2, and the overall footprint of the WWTP is about 670m2. The sewage treatment plant is located nearby in a residential community, and the plant area is covered with plantings which is integrated with the landscape of the residential community. Since the completion of the project, the stable operation has been achieved, and the effluent quality has reached the standard of wastewater reuse.
FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.
FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.
Product detail pictures:
Related Product Guide:
It truly is a great way to improve our merchandise and repair. Our mission should be to create imaginative products to prospects with a excellent knowledge for Short Lead Time for Wastewater Treatment Plant Plan - Bajing Town, China – JDL , The product will supply to all over the world, such as: Orlando, Chile, The Swiss, With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
By Kim from Kenya - 2018.07.12 12:19
The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
By Beatrice from Burundi - 2018.06.21 17:11