page_banner

OEM/ODM Supplier Mbr Sewage Treatment Plant Plan - Huizhou City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The key to our success is "Good Products Good quality, Reasonable Value and Efficient Service" for Integrated Sewage Treatment Design Construction, Tertiary Wastewater Treatment Plant, Decentralized Wastewater Treatment, With the tenet of "faith-based, customer first", we welcome clients to call or e-mail us for cooperation.
OEM/ODM Supplier Mbr Sewage Treatment Plant Plan - Huizhou City, China – JDL Detail:

Location: Huizhou City, China

Treatment Capacity: 20,000 m3/d

WWTP Type: Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product wharf, fisher wharf, dragon bay, Qianjin wharf and residential areas along the coast. The WWTP is built on the seaside, close to the residential area, has a small footprint, few residual organic sludge discharging and no odor in daily operation, which does not affect the surrounding environment.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.

The traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

OEM/ODM Supplier Mbr Sewage Treatment Plant Plan - Huizhou City, China – JDL detail pictures


Related Product Guide:

We've one of the most advanced generation tools, experienced and qualified engineers and workers, recognized good quality manage systems and a friendly skilled product sales workforce pre/after-sales support for OEM/ODM Supplier Mbr Sewage Treatment Plant Plan - Huizhou City, China – JDL , The product will supply to all over the world, such as: Korea, Birmingham, Norway, With the spirit of "credit first, development through innovation, sincere cooperation and joint growth", our company is striving to create a brilliant future with you, so as to become a most valuable platform for exporting our goods in China!
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Griselda from Zimbabwe - 2017.08.21 14:13
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By jari dedenroth from Spain - 2018.09.21 11:01
    Write your message here and send it to us