page_banner

New Arrival China Packaged Sewage Treatment Plant - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Gaining client pleasure is our company's aim without end. We are going to make excellent efforts to create new and top-quality goods, meet your special requirements and provide you with pre-sale, on-sale and after-sale companies for Water Pollution Control Design Construction, Wastewater Treatment Plant Project, Advanced Biological Wastewater Treatment, In case you are intrigued in almost any of our merchandise, remember to will not hesitate to make contact with us and take the initial step to create up a prosperous enterprise romance.
New Arrival China Packaged Sewage Treatment Plant - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

New Arrival China Packaged Sewage Treatment Plant - Chongqing City, China – JDL detail pictures

New Arrival China Packaged Sewage Treatment Plant - Chongqing City, China – JDL detail pictures


Related Product Guide:

Our focus on should be to consolidate and enhance the quality and repair of present products, in the meantime constantly establish new products to meet unique customers' requires for New Arrival China Packaged Sewage Treatment Plant - Chongqing City, China – JDL , The product will supply to all over the world, such as: Costa rica, Adelaide, Netherlands, Our products are produced with the best raw materials. Every moment, we constantly improve the production programme. In order to ensure better quality and service, we have been focusing on the production process. We have got high praise by partner. We are looking forward to establishing business relationship with you.
  • The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.
    5 Stars By EliecerJimenez from Suriname - 2018.11.06 10:04
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Marco from Sevilla - 2017.11.01 17:04
    Write your message here and send it to us