As for competitive selling prices, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we are the lowest around for Wastewater Treatment Technology Proposal, Sewage Treatment Design Construction, Mbr Sewage Treatment Plan, Should you be interested in almost any goods, remember to truly feel totally free to get in touch with us for further facts or be sure to deliver us email right, we will reply you in just 24 hrs as well as the finest quotation are going to be provided.
Massive Selection for Wastewater Treatment Plant Consulting - Nanchang City, China – JDL Detail:

Location: Nanchang City, China

Time: 2018

Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government selected JDL FMBR technology and adopted the decentralized treatment idea of “Collect, Treat and Reuse the Wastewater On-sit”.

Ten decentralization wastewater treatment plants were set up around the Wusha River basin, and it just took only 2 months for one of the WWTP’s construction work. The project has a wide range of treatment points, however, thanks to FMBR’s characteristic of simple operation, it does not need professional staffs like the traditional wastewater treatment plant to stay on the site. Instead, it uses the Internet of Things + Cloud Platform Central Monitoring System and mobile O&M station to shorten the response time on site, so as to realize long-term and stable operation of wastewater facilities under the unattended conditions. The effluent of the project can meet the standard, and the main indexes meet the Water Reuse Standard. The effluent replenishes the Wusha river to make the river clean. At the same time, the plants were design to integrate the local landscape, realizing the harmonious coexistence of wastewater facilities and surrounding environment.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.


Product detail pictures:

Massive Selection for Wastewater Treatment Plant Consulting - Nanchang City, China – JDL detail pictures


Related Product Guide:

Our well-equipped facilities and exceptional good quality manage throughout all stages of production enables us to guarantee total shopper satisfaction for Massive Selection for Wastewater Treatment Plant Consulting - Nanchang City, China – JDL , The product will supply to all over the world, such as: Rotterdam, Rotterdam, Bahamas, Our company warmly invites domestic and overseas customers to come and negotiate business with us. Allow us to join hands to create a brilliant tomorrow! We've been looking forward to cooperating with you sincerely to achieve a win-win situation. We promise to try our best to deliver you with high quality and efficient services.
  • Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Ricardo from Bolivia - 2018.03.03 13:09
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Antonio from Spain - 2018.09.23 17:37
    Write your message here and send it to us