page_banner

Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our items are commonly identified and trusted by customers and may fulfill continuously switching economic and social wants of Wastewater Treatment, Advanced Biological Sewage Treatment Plant Project, Water Pollution Control Proposal, Welcome to post your sample and color ring to let us produce according to your specification.Welcome your inquiry! Looking forward to building long-term cooperation with you!
Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL detail pictures

Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL detail pictures


Related Product Guide:

Our objective is to present premium quality products at aggressive prices, and top-notch services to buyers around the world. We have been ISO9001, CE, and GS certified and strictly adhere to their excellent specifications for Manufacturer of Mbr Wastewater Treatment Consulting - Chongqing City, China – JDL , The product will supply to all over the world, such as: Algeria, Barbados, Costa Rica, Our production have been exported to more than 30 countries and regions as first hand source with lowest price. We sincerely welcome customers from both at home and abroad to come to negotiate business with us.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Louise from Chile - 2017.11.11 11:41
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Pag from Salt Lake City - 2017.06.19 13:51
    Write your message here and send it to us