page_banner

Hot sale Factory Advanced Biological Sewage Treatment Plant - Chongqing City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We insist about the theory of growth of 'High excellent, Performance, Sincerity and Down-to-earth working approach' to offer you with great company of processing for Biological Water Pollution Control, Advanced Biological Sewage Treatment Plant Construction, Biological Water Pollution Control, We put honest and health as the primary responsibility. We have a professional international trade team which graduated from America. We are your next business partner.
Hot sale Factory Advanced Biological Sewage Treatment Plant - Chongqing City, China – JDL Detail:

Location: Chongqing City, China

Time: 2019

Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent

Project Brief:

In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluent is clear and replenished to the lake in the scenic areas.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem. With these two problems, the traditional WWTPs are usually in big size and far away from the residential area, so large sewer system with high investment is also required. There will be also a lot of inflow and infiltration in the sewer system, it will not only contaminate the underground water, but will also reduce the treatment efficiency of the WWTPs. According to some studies, the sewer investment will take around 80% of overall wastewater treatment investment.


Product detail pictures:

Hot sale Factory Advanced Biological Sewage Treatment Plant - Chongqing City, China – JDL detail pictures

Hot sale Factory Advanced Biological Sewage Treatment Plant - Chongqing City, China – JDL detail pictures


Related Product Guide:

To meet the customers' over-expected satisfaction , we have our strong team to provide our best overall service which includes marketing, sales, designing, production, quality controlling, packing, warehousing and logistics for Hot sale Factory Advanced Biological Sewage Treatment Plant - Chongqing City, China – JDL , The product will supply to all over the world, such as: USA, Ottawa, Guinea, Now, we professionally supplies customers with our main products And our business is not only the "buy" and "sell", but also focus on more. We target to be your loyal supplier and long-term cooperator in China. Now, We hope to be the friends with you.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Belinda from Indonesia - 2017.09.28 18:29
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Roberta from Istanbul - 2017.11.12 12:31
    Write your message here and send it to us