Home
About JDL
Technology Introduction
Principle Of FMBR Technology
FMBR Patents And Awards
Project Cases
Municipal WWTP
Decentralized WWTP
High Effluent Quality WWTP (River & Surface Water Discharge)
Effluent Reclaimed WWTP
Product & Service
Work With Us
Contact
English
Home
Featured
Top Suppliers Biological Wastewater Treatment Plant - Nanchang City, China – JDL
Location: Nanchang City, China Time: 2020 Treatment Capacity: 10,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
inquiry
detail
Chinese wholesale Domestic Sewage Treatment Plant - Lianyungang City, China – JDL
Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
inquiry
detail
High Quality Water Pollution Control Technology Construction - Chongqing City, China – JDL
Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
inquiry
detail
OEM/ODM Factory Mbr Sewage Treatment Plant Proposal - Town of Plymouth, USA – JDL
Location: Town of Plymouth, USA Time: 2019 Treatment Capacity: 19m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In March 2018, in order to discover the leading edge new technologies in the field of wastewater treatment and achieve the goal of reducing the energy consumption of wastewater treatment, Massachusetts, as a global clean energy center, publicly solicited cutting-edge technologies for wastewater treatment globally, whic...
inquiry
detail
Special Price for Mbr Sewage Treatment Design - Chongqing City, China – JDL
Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
inquiry
detail
OEM Supply Mbr Sewage Treatment Project - Nanchang City, China – JDL
Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
inquiry
detail
One of Hottest for Secondary Mbr Sewage Treatment - Wuhu City, China – JDL
Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
inquiry
detail
Fast delivery Domestic Sewage Treatment - Lianyungang City, China – JDL
Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
inquiry
detail
Excellent quality Mbr Sewage Treatment Construction - Jiangxi Province, China – JDL
Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...
inquiry
detail
Discountable price Water Pollution Control Consulting - China Cheap price Water Pollution Control Technology Project - Wuhu City, China – JDL – JDL
Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
inquiry
detail
Reasonable price Integrated Mbr Wastewater Treatment - Jiangxi Province, China – JDL
Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...
inquiry
detail
Factory directly supply Water Pollution Control Plant Project - Nanchang City, China – JDL
Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
inquiry
detail
<<
< Previous
93
94
95
96
97
98
99
Next >
>>
Page 96 / 225
Hit enter to search or ESC to close