page_banner
  • OEM/ODM Supplier Wastewater Treatment Plant Construction - Zhufang Village, China – JDL

    OEM/ODM Supplier Wastewater Treatment Plant Construction - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • PriceList for Advanced Biological Wastewater Treatment Design Plan - Jiangxi Province, China – JDL

    PriceList for Advanced Biological Wastewater Treatment Design Plan - Jiangxi Province, China – JDL

    Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...
  • Factory made hot-sale Water Pollution Control Equipment Plan - Nanchang City, China – JDL

    Factory made hot-sale Water Pollution Control Equipment Plan - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • Reliable Supplier Wastewater Treatment Technology Construction - Lianyungang City, China – JDL

    Reliable Supplier Wastewater Treatment Technology Construction - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Fast delivery Domestic Sewage Treatment - Huizhou City, China – JDL

    Fast delivery Domestic Sewage Treatment - Huizhou City, China – JDL

    Location: Huizhou City, China Treatment Capacity: 20,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product...
  • Personlized Products Wastewater Treatment System Construction - Bajing Town, China – JDL

    Personlized Products Wastewater Treatment System Construction - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • OEM/ODM Factory Mbr Sewage Treatment Plant Proposal - Lianyungang City, China – JDL

    OEM/ODM Factory Mbr Sewage Treatment Plant Proposal - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • OEM Supply Wastewater Treatment Construction - Chongqing City, China – JDL

    OEM Supply Wastewater Treatment Construction - Chongqing City, China – JDL

    Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
  • Factory supplied Water Pollution Control Equipment Proposal - Nanchang City, China – JDL

    Factory supplied Water Pollution Control Equipment Proposal - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • Super Lowest Price Advanced Biological Wastewater Treatment Project - Wuhu City, China – JDL

    Super Lowest Price Advanced Biological Wastewater Treatment Project - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • factory customized Water Pollution Control Plant Proposal - Nanchang City, China – JDL

    factory customized Water Pollution Control Plant Proposal - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2020 Treatment Capacity: 10,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
  • Wholesale Sewage Treatment Plan - China Cheap price Water Pollution Control Technology Project - Wuhu City, China – JDL – JDL

    Wholesale Sewage Treatment Plan - China Cheap price Water Pollution Control Technology Project - Wuhu City, China – JDL – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...