page_banner
  • Cheapest Price Mbr Wastewater Treatment Design Proposal - Nanchang City, China – JDL

    Cheapest Price Mbr Wastewater Treatment Design Proposal - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • Discount Price Wastewater Treatment Plant Proposal - Huizhou City, China – JDL

    Discount Price Wastewater Treatment Plant Proposal - Huizhou City, China – JDL

    Location: Huizhou City, China Treatment Capacity: 20,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product...
  • OEM/ODM China Integrated Sewage Treatment Design Construction - Wuhu City, China – JDL

    OEM/ODM China Integrated Sewage Treatment Design Construction - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • Super Lowest Price Integrated Wastewater Treatment - Huizhou City, China – JDL

    Super Lowest Price Integrated Wastewater Treatment - Huizhou City, China – JDL

    Location: Huizhou City, China Treatment Capacity: 20,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product...
  • Big Discount Mbr Sewage Treatment Technology - Bajing Town, China – JDL

    Big Discount Mbr Sewage Treatment Technology - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Cheap price Municipal Sewage Treatment - Bajing Town, China – JDL

    Cheap price Municipal Sewage Treatment - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Top Suppliers Biological Wastewater Treatment Plant - Wuhu City, China – JDL

    Top Suppliers Biological Wastewater Treatment Plant - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • Good quality Advanced Biological Wastewater Treatment Equipment Construction - Bajing Town, China – JDL

    Good quality Advanced Biological Wastewater Treatment Equipment Construction - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • High definition Advanced Biological Wastewater Treatment Equipment Plan - Bajing Town, China – JDL

    High definition Advanced Biological Wastewater Treatment Equipment Plan - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Online Exporter Sewage Treatment System Plan - Nanchang City, China – JDL

    Online Exporter Sewage Treatment System Plan - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • OEM/ODM China Integrated Sewage Treatment Design Construction - Zhufang Village, China – JDL

    OEM/ODM China Integrated Sewage Treatment Design Construction - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • Well-designed Packaged Sewage Treatment Design - Jiangxi Province, China – JDL

    Well-designed Packaged Sewage Treatment Design - Jiangxi Province, China – JDL

    Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...