page_banner
  • High definition Advanced Biological Wastewater Treatment Equipment Plan - Zhufang Village, China – JDL

    High definition Advanced Biological Wastewater Treatment Equipment Plan - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • 2020 Latest Design Sewage Treatment Design Plan - Chongqing City, China – JDL

    2020 Latest Design Sewage Treatment Design Plan - Chongqing City, China – JDL

    Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
  • Discount wholesale Water Pollution Control Project - Town of Plymouth, USA – JDL

    Discount wholesale Water Pollution Control Project - Town of Plymouth, USA – JDL

    Location: Town of Plymouth, USA Time: 2019 Treatment Capacity: 19m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In March 2018, in order to discover the leading edge new technologies in the field of wastewater treatment and achieve the goal of reducing the energy consumption of wastewater treatment, Massachusetts, as a global clean energy center, publicly solicited cutting-edge technologies for wastewater treatment globally, whic...
  • Factory making Advanced Biological Sewage Treatment Equipment Plan - Nanchang City, China – JDL

    Factory making Advanced Biological Sewage Treatment Equipment Plan - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • High definition Mbr Sewage Treatment Consulting - Huizhou City, China – JDL

    High definition Mbr Sewage Treatment Consulting - Huizhou City, China – JDL

    Location: Huizhou City, China Treatment Capacity: 20,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product...
  • Well-designed Packaged Sewage Treatment Design - Wuhu City, China – JDL

    Well-designed Packaged Sewage Treatment Design - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • OEM Factory for Centralized Wastewater Treatment - Bajing Town, China – JDL

    OEM Factory for Centralized Wastewater Treatment - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • OEM/ODM Manufacturer Advanced Sewage Treatment - Lianyungang City, China – JDL

    OEM/ODM Manufacturer Advanced Sewage Treatment - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • 2020 wholesale price Advanced Biological Sewage Treatment System Plan - Nanchang City, China – JDL

    2020 wholesale price Advanced Biological Sewage Treatment System Plan - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2020 Treatment Capacity: 20,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
  • Discountable price Water Pollution Control Consulting - Wuhu City, China – JDL

    Discountable price Water Pollution Control Consulting - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • Short Lead Time for Sewage Treatment Plant Proposal - Jiangxi Province, China – JDL

    Short Lead Time for Sewage Treatment Plant Proposal - Jiangxi Province, China – JDL

    Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...
  • High Quality for Membrane Wastewater Treatment - Lianyungang City, China – JDL

    High Quality for Membrane Wastewater Treatment - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...