page_banner
  • Hot New Products Advanced Biological Sewage Treatment Technology - Nanchang City, China – JDL

    Hot New Products Advanced Biological Sewage Treatment Technology - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • OEM Manufacturer Wastewater Treatment Plant Project - Chongqing City, China – JDL

    OEM Manufacturer Wastewater Treatment Plant Project - Chongqing City, China – JDL

    Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
  • Cheapest Price Water Pollution Control Plan - Zhufang Village, China – JDL

    Cheapest Price Water Pollution Control Plan - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • Factory Outlets Integrated Sewage Treatment - Zhufang Village, China – JDL

    Factory Outlets Integrated Sewage Treatment - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • Hot Sale for Mbr Wastewater Treatment System - Nanchang City, China – JDL

    Hot Sale for Mbr Wastewater Treatment System - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2020 Treatment Capacity: 20,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
  • Short Lead Time for Wastewater Treatment Plant Plan - Nanchang City, China – JDL

    Short Lead Time for Wastewater Treatment Plant Plan - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2020 Treatment Capacity: 20,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
  • Hot sale Wastewater Treatment Project - Lianyungang City, China – JDL

    Hot sale Wastewater Treatment Project - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Factory Cheap Advanced Biological Sewage Treatment Plant Consulting - Town of Plymouth, USA – JDL

    Factory Cheap Advanced Biological Sewage Treatment Plant Consulting - Town of Plymouth, USA – JDL

    Location: Town of Plymouth, USA Time: 2019 Treatment Capacity: 19m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In March 2018, in order to discover the leading edge new technologies in the field of wastewater treatment and achieve the goal of reducing the energy consumption of wastewater treatment, Massachusetts, as a global clean energy center, publicly solicited cutting-edge technologies for wastewater treatment globally, whic...
  • Good quality Biological Sewage Treatment Plant - Lianyungang City, China – JDL

    Good quality Biological Sewage Treatment Plant - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Manufacturer for Biological Sewage Treatment Design - Bajing Town, China – JDL

    Manufacturer for Biological Sewage Treatment Design - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Factory Supply Advanced Biological Wastewater Treatment Equipment Proposal - Jiangxi Province, China – JDL

    Factory Supply Advanced Biological Wastewater Treatment Equipment Proposal - Jiangxi Province, China – JDL

    Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...
  • Chinese Professional Domestic Mbr Sewage Treatment - Bajing Town, China – JDL

    Chinese Professional Domestic Mbr Sewage Treatment - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....