  • Wholesale Discount Water Pollution Control Design Construction - Lianyungang City, China – JDL

    Wholesale Discount Water Pollution Control Design Construction - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Manufacturer for Secondary Sewage Treatment - Bajing Town, China – JDL

    Manufacturer for Secondary Sewage Treatment - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Factory best selling Advanced Biological Sewage Treatment Plant Plan - Bajing Town, China – JDL

    Factory best selling Advanced Biological Sewage Treatment Plant Plan - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Reasonable price for Advanced Biological Sewage Treatment Plant Project - Zhufang Village, China – JDL

    Reasonable price for Advanced Biological Sewage Treatment Plant Project - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • Hot sale Wastewater Treatment Project - Nanchang City, China – JDL

    Hot sale Wastewater Treatment Project - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • Wholesale Domestic Sewage Treatment Plan - Jiangxi Province, China – JDL

    Wholesale Domestic Sewage Treatment Plan - Jiangxi Province, China – JDL

    Location: Jiangxi Province, China Time: 2014 Total Treatment Capacity: 13.2 MGD WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater–Pretreatment–FMBR–Effluent Project Brief: This project covers 120 central towns within 10 cities and adopts more than 120 FMBR equipment, with a total treatment capacity of 13.2 MGD. By using the remote monitoring + mobile service station management model, all the units can be operated and maintained by very few people. FMBR technology is a sewage ...
  • Bottom price Wastewater Treatment Design - Nanchang City, China – JDL

    Bottom price Wastewater Treatment Design - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • Quality Inspection for Wastewater Treatment System Project - Lianyungang City, China – JDL

    Quality Inspection for Wastewater Treatment System Project - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Factory supplied Advanced Biological Sewage Treatment Equipment Construction - Huizhou City, China – JDL

    Factory supplied Advanced Biological Sewage Treatment Equipment Construction - Huizhou City, China – JDL

    Location: Huizhou City, China Treatment Capacity: 20,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: The Coastal Park FMBR STP is located at Huizhou City. The designed domestic wastewater treatment scale is 20,000m3/day. The main structure of the WWTP is intake tank, screen tank, equalization tank, FMBR equipment, effluent tank and measuring tank. The wastewater is mainly collected from the coastal park, aquatic product...
  • Factory directly supply Advanced Biological Sewage Treatment Equipment Proposal - Nanchang City, China – JDL

    Factory directly supply Advanced Biological Sewage Treatment Equipment Proposal - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2020 Treatment Capacity: 20,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
  • Fixed Competitive Price Water Pollution Control System - Zhufang Village, China – JDL

    Fixed Competitive Price Water Pollution Control System - Zhufang Village, China – JDL

    Location: Zhufang Village, China Time: 2014 Treatment capacity: 200 m3/d WWTP Type: Integrated FMBR Equipment WWTP Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Zhufang village FMBR WWTP project was completed and started operation in April 2014, with a daily capacity of 200 m3/d and a service population of about 2,000. The project’s O&M services is provided by JDL. By using of the Internet Remote Monitoring + Mobile O&M Station management mode, the project O&am...
  • Wholesale Domestic Sewage Treatment Plan - Bajing Town, China – JDL

    Wholesale Domestic Sewage Treatment Plan - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....