page_banner
  • Wholesale Price China Advanced Biological Sewage Treatment Technology Proposal - Chongqing City, China – JDL

    Wholesale Price China Advanced Biological Sewage Treatment Technology Proposal - Chongqing City, China – JDL

    Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
  • OEM Supply Wastewater Treatment Construction - Wuhu City, China – JDL

    OEM Supply Wastewater Treatment Construction - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • Manufactur standard Mbr Sewage Treatment - Nanchang City, China – JDL

    Manufactur standard Mbr Sewage Treatment - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2020 Treatment Capacity: 20,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to solve the environment issues caused by domestic sewage, and to effectively improve the quality of urban water environment, and at the same time, considering the disadvantages of traditional sewage treatment plants, such as large land occupation, heavy odor, need to stay away from the residential area and huge investment in pipe network, the local government ...
  • 2020 Latest Design Mbr Sewage Treatment Plan - Chongqing City, China – JDL

    2020 Latest Design Mbr Sewage Treatment Plan - Chongqing City, China – JDL

    Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
  • High Quality for Advanced Biological Wastewater Treatment Proposal - Lianyungang City, China – JDL

    High Quality for Advanced Biological Wastewater Treatment Proposal - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Hot Sale for Mbr Wastewater Treatment System - Bajing Town, China – JDL

    Hot Sale for Mbr Wastewater Treatment System - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Factory Cheap Hot Tertiary Sewage Treatment - Nanchang City, China – JDL

    Factory Cheap Hot Tertiary Sewage Treatment - Nanchang City, China – JDL

    Location: Nanchang City, China Time: 2018 Treatment Capacity: 10 WWTPs, the total treatment capacity is 116,500 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: Due to the insufficient treatment capacity of the existing wastewater treatment plant, a large amount of wastewater overflowed into the Wusha River, causing a serious water pollution. In order to improve the situation in a short time, local government s...
  • Quality Inspection for Packaged Sewage Treatment System - Lianyungang City, China – JDL

    Quality Inspection for Packaged Sewage Treatment System - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...
  • Hot sale Integrated Mbr Sewage Treatment - Wuhu City, China – JDL

    Hot sale Integrated Mbr Sewage Treatment - Wuhu City, China – JDL

    Location: Wuhu City, China Time: 2019 Treatment Capacity: 16,100 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6 Project Brief: The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the curr...
  • Hot sale Factory Water Pollution Control Proposal - Chongqing City, China – JDL

    Hot sale Factory Water Pollution Control Proposal - Chongqing City, China – JDL

    Location: Chongqing City, China Time: 2019 Treatment Capacity: 10 WWTPs, the total treatment capacity is 4,000 m3/d WWTP Type: Decentralized Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: In January 2019, Chongqing Jiulongpo scenic area adopted FMBR technology to treat the wastewater in the scenic area. The WWTP is integrated with surrounding environment of the scenic area. The treatment capacity is 4,000 m3/d. After treatment, the effluen...
  • Cheapest Price Mbr Wastewater Treatment Design Proposal - Bajing Town, China – JDL

    Cheapest Price Mbr Wastewater Treatment Design Proposal - Bajing Town, China – JDL

    Location: Bajing Town, China Time: 2014 Treatment Capacity: 2,000 m3/d WWTP Type: Integrated FMBR Equipment WWTPs Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent Project Brief: By referring to the wastewater treatment practices of other townships, Bajing town planed to transport sewage to the suburbs for treatment at the beginning. However, due to the high sewer investment, the difficulty in pipe network construction and the large footprint of treatment plant, the project was suspended....
  • Bottom price Mbr Sewage Treatment Design Proposal - Lianyungang City, China – JDL

    Bottom price Mbr Sewage Treatment Design Proposal - Lianyungang City, China – JDL

    Location: Lianyungang City, China Time: 2019 Treatment Capacity: 130,000 m3/d WWTP Type: Facility Type FMBR WWTP Project Brief: In order to protect the local ecological environment and highlight the appearance of a livable and industrial coastal city, the local government chosed FMBR technology to build a park-style ecological sewage treatment plant. Different from the traditional sewage treatment technology which has large footprint, heavy odor, and above-ground construction mode, the...