Location: Wuhu City, China
Time: 2019
Treatment Capacity: 16,100 m3/d
WWTP Type: Decentralized Integrated FMBR Equipment WWTPs
Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6
Project Brief:
The project adopted FMBR technology the decentralized treatment idea of "Collect, Treat and Reuse On-site ". The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the current status of river pollution.