page_banner

China Supplier Secondary Wastewater Treatment Plant - Wuhu City, China – JDL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have quite a few great team customers very good at internet marketing, QC, and dealing with kinds of troublesome trouble while in the output approach for Advanced Biological Wastewater Treatment System, Sewage Treatment, Water Pollution Control Proposal, Welcome your enquiry, best service will be provided with full heart.
China Supplier Secondary Wastewater Treatment Plant - Wuhu City, China – JDL Detail:

Location: Wuhu City, China

Time: 2019

Treatment Capacity: 16,100 m3/d

WWTP Type: Decentralized Integrated FMBR Equipment WWTPs

Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6

Project Brief:

The project adopted FMBR technology the decentralized treatment idea of “Collect, Treat and Reuse On-site “. The overall capacity of the project is 16,100 m3/d. At present, 3 WWTPs have been set up. The treated water replenishes the river on-site after treatment, which mitigates the current status of river pollution.

FMBR technology is a sewage treatment technology independently developed by JDL.The FMBR is a biological wastewater treatment process that removes carbon,nitrogen and phosphorus simultaneously in a single reactor.Emissions effectively solve the “neighboring effect”. FMBR successfully activated the decentralized application mode, and is widely used in municipal sewage treatment, rural decentralized sewage treatment, watershed remediation, etc.

FMBR is the abbreviation for facultative membrane bioreactor. FMBR uses the characteristic microorganism to create a facultative environment and form a food chain, creatively achieving low organic sludge discharge and simultaneous degradation of pollutants. Due to the efficient separation effect of the membrane, the separation effect is far better than that of the traditional sedimentation tank, the treated effluent is extremely clear, and the suspended matter and turbidity are very low.

Characteristics Of FMBR:Simultaneous removal of organic carbon, nitrogen and phosphorus,

Less organic residual sludge discharging, Excellent discharge quality, Minimum chemical addition for N & P removal,Short construction period,Small footprint,Low cost/low energy consumption,

Reduce carbon emissions,Automated and unattended

The traditional wastewater treatment technology has many treatment processes, so it needs lots of tanks for the WWTPs, which makes the WWTPs a complicated structure with big footprint. Even for a small WWTPs, it also needs many tanks, which will lead to a relative higher construction cost. This is the so called “Scale Effect”. At the same time, the traditional wastewater treatment process will discharge a large number of sludge, and the odor is heavy, which means that the WWTPs can be built near the residential area. This is the so called “Not in My Backyard” problem.


Product detail pictures:

China Supplier Secondary Wastewater Treatment Plant - Wuhu City, China – JDL detail pictures


Related Product Guide:

Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for China Supplier Secondary Wastewater Treatment Plant - Wuhu City, China – JDL , The product will supply to all over the world, such as: Indonesia, Danish, Leicester, Our items have been obtained more and more recognition from foreign clients, and established long term and cooperative relationship with them. We`ll supply the best service for every customer and sincerely welcome friends to work with us and establish the mutual benefit together.
  • It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Norma from Amman - 2017.11.29 11:09
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Jerry from Turkey - 2017.08.18 18:38
    Write your message here and send it to us